2026 Street Surface Seal Project (Area 2)

2025 Street Surface Seal Project

Project Highlights

  • Preserving roadway conditions and extending pavement life.
  • Installation of new protected bike lanes along Hickey Blvd, consistent with the City’s Bicycle and Pedestrian Master Plan
  • Construction timeline:
    • Schedule TBD.
      *Timeline subject to change 

Overview

The 2026 Street Surface Seal Project is a key part of South San Francisco’s ongoing Pavement Management Program. This project focuses on preserving roadway conditions and extending pavement life in the Winston Manor and Serra Highlands neighborhoods. The work includes applying a protective surface treatment, commonly referred to as a “slurry seal,” to approximately 440,000 square yards of existing asphalt streets.

The project also includes several critical maintenance and safety enhancements:

  1. Structural Repairs – Repairing damaged pavement prior to sealing through localized base repairs and crack sealing to prevent water infiltration.
  2. Surface Treatment – Applying a full surface seal to protect the roadway from sun exposure and moisture, extend pavement life, and improve skid resistance.
  3. Safety Striping – Refreshing painted curbs and replacing worn pavement markings with new, high-visibility striping and pavement markings.

 

This photo reflects three steps to the street surface seal project. Step 1 Structural Repairs. Step 2 Surface Treatment. Step 3 Safety Striping

Project Map

The 2026 Street Surface Seal Project focuses on Areas 2.

TBD

Interactive Slurry Schedule Map

Click the link below to explore the Project Map and view the proposed Slurry Schedule:

    INTERACTIVE MAP     

Full Surface Seal Application Schedule

Click below to download the detailed weekly schedule maps showing planned work by street and date.

Weekly Schedule Map (PDF)(PDF, 39MB)

Weekly Schedule Excel(PDF, 83KB)

Frequently Asked Questions

Who will be performing this work?

The City has contracted with Dryco Construction, Inc. for this project. Founded in 1985, Dryco Construction has successfully delivered numerous paving projects throughout the Bay Area.

Will there be road closures, traffic impacts, or access issues during construction?

Yes, temporary lane closures and detours will be in place during construction. Every effort will be made to maintain access for vehicles, pedestrians, and cyclists, including access to nearby driveways, throughout the construction period.

Please drive carefully through construction zones to ensure the safety of both the public and construction workers.

What should we expect during construction?

Temporary “No Parking” signs and electronic message boards will be posted in advance of work. Access to active construction zones will be limited; however, priority access will be maintained for local residents. Affected residents will also receive advance notice of scheduled work.

Project Flyers

English

Spanish(PDF, 3MB)

Tagalog(PDF, 3MB)

Chinese(PDF, 3MB)

Any questions?

Please contact the Project Construction Manager, Dave Bishop, at (650) 333-0832 or dave@csgengr.com. Or the City’s Project Manager, Jeffrey Chou, at (650) 829-6668 or Jeffrey.chou@ssfca.gov.

This photo reflects the 3 phases of street surface seal process. Phase 1 Localized Base Repairs. Phase 2 Crack Sealing and Prep. Phase 3 Surface Seal & New Striping.

 

This photo reflects Active Traffic Control  This photo reflects Priority Local Access. 

 This photo reflects Clear Parking Restrictions.  This photo reflects Advance Resident Notification.